South Wales Ceramics & Stones (Wall And Floor Tilers)
Why Choose Us?
Business overview
Wall - Floor Tilers in Cardiff - Newport and South Wales Valleys
South Wales Ceramics and Stones.
The Complete Professional Tiling Service working throughout Cardiff, Newport and the South Wales Valleys.
No job too small, we provide a range of services from small repairs to complete projects - from a splash-back to complete Bathroom - Kitchen Installations.
We will plan, design, install your kitchen/bathroom, all to your timescale and budget.
Taking pride in our work, with a first class service, in a caring manner helping to make the project stress free for you.
As a customer we will offer you a free quotation, which includes a full list of materials and costs.
Then once your happy with your design and cost, you arrange the purchase of tiles and leave the rest to us.
All this at a competitive price, from a business that cares.
Call South Wales Ceramics and Stones today....
We also offer a Decorating and Property Maintenance Service.
Photos
Products & Services
wall and floor tiling
ceramic tiling
kitchen tiling
bathroom tiling
floor tiling
wall tiling
mosaic floor tiling
quarry tiling
grouting
regrouting
wall and floor tiler
ceramic tiler
kitchen tiler
bathroom tiler
floor tiler
wall tiler
mosaic floor tiler
bathroom - Kitchen installations
bathroom - Kitchen fitter
Cloakroom Installations
Cloakroom fitter
shower installations
tiling repairs
wall and floor tilers
ceramic tilers
kitchen tilers
bathroom tilers
mosaic floor tilers tilers
floor tilers
wall tilers
ceramic wall tilers
Reviews
wonderful work
5Thank you for a my lovely bathroom.
Abandoned the project and left a mess with adhesive everywhere.
2Started to sense things were a bit off when he didn't turn up for two consecutive days mid-week. I asked where he was just in case there was a problem (in a nice way) and he complained that I was looking over his shoulder and clock-watching.
With about 2/3 of the job done he sent me an email saying he was no longer trading as a tiler and so was effectively abandoning the job. This was devastating for us as it caused at least 2 weeks delays due to not being able to finish second fix plumbing until the tiling was complete, and he hadn't finished a single room. So we've had to find a new tiler and delay moving in by two weeks (and all the costs involved in that).
Since then I've had 4 different tilers visit to quote on finishing the work and all have been appalled by the quality of work and the mess left - especially adhesive left between tiles on the floors which now all needs to be dug out before grout is applied.
This job was postponed for over a month as the builder had not finished what he needed to do for me to start....when i did start i was unable to complete any of the rooms as again the builder needed to finish things in these rooms. At one stage i had to leave the work in bathrooms to tile an area of the kitchen floor so the kitchen fitters could fit there kitchen. As for the adhesive in the grout lines i use tiling clips so in the odd area of the clip, adhesive can set around the clip, but this is cleaned out before i grout... So yes i did walk away from the job with 2/3 rds of the work completed, as i was unable complete any of the rooms. I was paid for only half the tiling priced. I was unable to work full days and weeks as i have explained because other work that was needed to be done for me to finish, instead of taking 2-3 weeks i was there over 5 weeks and still being messed about, i had other customers waiting for me to do there work and cut my loses and move off this job.
This job was postponed for over a month as the builder had not finished what he needed to do for me to start....when i did start i was unable to complete any of the rooms as again the builder needed to finish things in these rooms. At one stage i had to leave the work in bathrooms to tile an area of the kitchen floor so the kitchen fitters could fit there kitchen. As for the adhesive in the grout lines i use tiling clips so in the odd area of the clip, adhesive can set around the clip, but this is cleaned out before i grout... So yes i did walk away from the job with 2/3 rds of the work completed, as i was unable complete any of the rooms. I was paid for only half the tiling priced. I was unable to work full days and weeks as i have explained because other work that was needed to be done for me to finish, instead of taking 2-3 weeks i was there over 5 weeks and still being messed about, i had other customers waiting for me to do there work and cut my loses and move off this job.
Kitchen
5Bathroom Installation and other repairs
5Mr Quick - Cardiff