E B Plastering
Everybody needs an Ed
71 South End, Wigton, CA7 9JY Directionshttps://www.yell.com/biz/e-b-plastering-wigton-7126253/#view=map
Our location
Business overview
Your Property is Our Passion
I have been plastering now for since 2004. We do all internal plastering, i.e. solid plastering, dot and dab, stud walling etc. We also do traditional lime plastering and insulating lime plastering using a technique developed by Tim Wells of Eden Lime Mortor. Other uses of lime based materials include lime pointing and rendering.
Along with plastering we also do house renovations from the ground up and including landscaping the garden.
We are fully insured and pride ourselves in "turning up on time" and leaving your property clean and tidy once we have finished. We also provide free estimates and advice.
Photos
Products & Services
Barn Conversions
Basement Conversion
Bathroom Tiling
Block Paving
Building Conversions
building maintenance & repairs
Building Refurbishments
Building Renovations
Ceilings
Chimneys
Damp Proofing
Dry Lining
Drywall
fascias & soffits
Fascias and Soffits
Floor Tiling
Garage Conversions
Gutter Repairs
Guttering Services
Home Improvements
Home Staging
house building
House Extensions
Kitchen Tiling
landscaping
Listed Buildings
Loft Conversions
Patio Laying
Patios
paving & driveways
Paving and Driveways
Pebble Dashing
Pointing
Porches
Property Maintenance
Repointing
Screed
Skimming
Storm Damage Repairs
Wall Rendering
Reviews
Excellent lime work
5Very Happy customer !
5Jon and Julia.
Reply to above review
5He wanted me to start applying the new render before the all the old was off even on one wall. This you cant do i.e. not practical. He got upset by this claiming he hadnt wanted to do the work himself in the first place. I had done nothing but supply him with free advice along with my supplier, and lent him my equipment to help him remove the old render. No money had changed hands and no contracts were signed therefore I was under no obligation to do the work. I had been waiting for him since the winter to take the old render off and was not prepared to waste my time waiting any further. Ed Birkett
Left in the lurch
1When Ed Birkett turned up last November I was quoted for the work and believed it would start in the Spring.
To save some of the cost we agreed that I would remove as much of the old render as I could. I was pleased by this because I do not have a lot of money.
In Spring he told me that he could not start before the last two weeks in June. Later, he turned up at my house and said that it would not harm if the rendering was not done until next year...this made me very worried, but I continued as best I could. I was also simultaneously dealing with dry rot and internal damp in most rooms of my house.
By mid June I had removed all of the render that I could without scaffold. I asked him for a start date.
I was astonished when he said that he could not start for a couple of months because he had other work on.
At this point I asked why I did not have priority since he had taken my job on last year and told me that he could start in June.
He then told me that it was my fault that I had been so slow to remove the render! I was appalled. I am a single parent and am not in the best of health. I had worked as hard as I could and felt deeply insulted and depressed by his accusations.
When I said that I did not like his attitude about this, he told me to get somebody else and walked away from the job.
I am now left with half the render off my walls and I still have a leaking chimney stack. I am finding it almost impossible to get other builders now.
I suppose my 9 year old daughter and I face yet another winter in a cold, damp house. I have no idea why he pulled out of the job like this.
I am gutted.